Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Salvage and reconstruction of Leerort bridge on Ems River, Germany
Total length of old bridge, divided into six spans of 51.45 to 84.00 m and one turn span of 2 × 41.95 m, was destroyed during war; drawbridge could not be reused but other parts were raised by lifting boats using tides; placing bridge spans on piers; caisson was necessary to remove damaged piers and to build new piers.
Salvage and reconstruction of Leerort bridge on Ems River, Germany
Total length of old bridge, divided into six spans of 51.45 to 84.00 m and one turn span of 2 × 41.95 m, was destroyed during war; drawbridge could not be reused but other parts were raised by lifting boats using tides; placing bridge spans on piers; caisson was necessary to remove damaged piers and to build new piers.
Salvage and reconstruction of Leerort bridge on Ems River, Germany
Bergung und Wiederherstellung der Emsbruecke Leerort
Klingenberg, W. (Autor:in)
Bauingenieur ; 24
1949
6 pages
Photographs, Diagrams
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1954
Reconstruction of bridge over Isar River at Gruenwald, Germany
Engineering Index Backfile | 1950
|Reconstruction of bombed bridge over Rhine river at Wesel, Germany
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1943
Reconstruction of highway bridge over Main river at Hanau-Steinheim, Germany
Engineering Index Backfile | 1951
|