Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Limestone airbase nears completion
Air Force Base consists of long runway, 340-ft span reinforced concrete arch hangar, control building and utilities; runway construction required moving of 1.5 million yd from cut to fill; gravel base compacted by 200-ton compactor; roof slab of hangar is 6 in. thick tapering to 5 in.; concrete floor 20 in. thick; falswork and concrete placement. (See also Constructor v 30 n 12 Dec 1948 p 29-31)
Limestone airbase nears completion
Air Force Base consists of long runway, 340-ft span reinforced concrete arch hangar, control building and utilities; runway construction required moving of 1.5 million yd from cut to fill; gravel base compacted by 200-ton compactor; roof slab of hangar is 6 in. thick tapering to 5 in.; concrete floor 20 in. thick; falswork and concrete placement. (See also Constructor v 30 n 12 Dec 1948 p 29-31)
Limestone airbase nears completion
Eng-News-Rec
Engineering News-Record ; 142
1949
6 pages
Photographs
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Limestone airbase nears completion
Engineering Index Backfile | 1948
Engineering Index Backfile | 1954
British Library Online Contents | 1998
Electrification Project Nears Completion
IuD Bahn | 1998
|Engineering Index Backfile | 1954