Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method consists of casting large wall sections horizontally on floor and tilting them to vertical position; it is adaptable to standardized or individually designed buildings; electrical and other conduits and outlet boxes installed before concrete is placed; method makes extensive use of power equipment and lends itself to many assembly line economies; recent examples illustrated.
Method consists of casting large wall sections horizontally on floor and tilting them to vertical position; it is adaptable to standardized or individually designed buildings; electrical and other conduits and outlet boxes installed before concrete is placed; method makes extensive use of power equipment and lends itself to many assembly line economies; recent examples illustrated.
Development of tilt-up construction
Am Concrete Inst -- J
Clark, C.A. (Autor:in)
1948
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1998
British Library Online Contents | 2007
|NTIS | 1992
|Engineering Index Backfile | 1951
|British Library Online Contents | 2000
|