Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Old viaduct wrecked from topside
700-ft viaduct at Nashville, Tenn, wrecked with equipment working on top; bents were stiffened as deck was removed to keep whole structure from collapsing; each of five gunited steel bents was cut into five sections and then loaded on to cars by locomotive crane working at track level.
Old viaduct wrecked from topside
700-ft viaduct at Nashville, Tenn, wrecked with equipment working on top; bents were stiffened as deck was removed to keep whole structure from collapsing; each of five gunited steel bents was cut into five sections and then loaded on to cars by locomotive crane working at track level.
Old viaduct wrecked from topside
Construction Methods
Construction Methods ; 30
1948
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1944
|Engineering Index Backfile | 1918
Taylor & Francis Verlag | 2011
|Repairing two bomb wrecked bridges
Engineering Index Backfile | 1939
|Cofferdam wrecked by splitting of concrete seal
Engineering Index Backfile | 1924
|