Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Eastshore freeway -- Roadbed stabilization in marshland
Replacement of soft material with hydraulically placed dredged sand is used to stabilize unsatisfactory base for new freeway along eastern shore of San Francisco Bay; pump line is 5 mi long from dredger to point of discharge; description of hydraulic fill and dredging operation.
Eastshore freeway -- Roadbed stabilization in marshland
Replacement of soft material with hydraulically placed dredged sand is used to stabilize unsatisfactory base for new freeway along eastern shore of San Francisco Bay; pump line is 5 mi long from dredger to point of discharge; description of hydraulic fill and dredging operation.
Eastshore freeway -- Roadbed stabilization in marshland
Western Construction News
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1964
|Evaluation of MarshLand Soil Attenuation Capacity
British Library Conference Proceedings | 1993
|Construction on marshland deposits -- Treatments and results
Engineering Index Backfile | 1966
|SOIL STABILIZATION AND IMPROVEMENT OF MARINE CLAYS USING CEMENT AND LIME IN A MARSHLAND
DOAJ | 2020
|