Face-lifting Milwaukee's Wisconsin ave
New pavement consists of 8-in. concrete base with 3-in. asphalt surface; curbs were set back 5 ft on either side, thus furnishing 60-ft roadway; pedestrian safety islands 5 ft wide by 30 ft long were provided; 57 ft 6 in. wide base was concreted in three 19 ft 2 in. lanes; method of casting traffic strips on top of green concrete base is described.
Face-lifting Milwaukee's Wisconsin ave
New pavement consists of 8-in. concrete base with 3-in. asphalt surface; curbs were set back 5 ft on either side, thus furnishing 60-ft roadway; pedestrian safety islands 5 ft wide by 30 ft long were provided; 57 ft 6 in. wide base was concreted in three 19 ft 2 in. lanes; method of casting traffic strips on top of green concrete base is described.
Face-lifting Milwaukee's Wisconsin ave
Roads Streets
Roads and Streets ; 91
1948
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Milwaukee's 73-year old water tower gets face lifting
Engineering Index Backfile | 1946
|Online Contents | 1996
|Milwaukee's special-section sewer
Engineering Index Backfile | 1948
Engineering Index Backfile | 1955
|Engineering Index Backfile | 1912
|