Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Storage basin with 430 million cu m capacity is to be formed by concrete gravity dam with 278 m max height; construction of total project scheduled for period of 7 yr; concrete plant designed for output of 5000 cu m in 20-hr shift; total concrete volume amounts to 6.4 million cu m. See also Engineering Index 1935 p 563, and Engineering Index 1947 p 575.
Storage basin with 430 million cu m capacity is to be formed by concrete gravity dam with 278 m max height; construction of total project scheduled for period of 7 yr; concrete plant designed for output of 5000 cu m in 20-hr shift; total concrete volume amounts to 6.4 million cu m. See also Engineering Index 1935 p 563, and Engineering Index 1947 p 575.
Dixence storage power plant, Switzerland
Das Speicher-Kraftwerk Gross-Dixence
Loretan, M. (Autor:in)
1948
4 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Grande dixence dam (Switzerland)
Engineering Index Backfile | 1957
|Dixence hydroelectric plant at Chandoline, Valais, Switzerland
Engineering Index Backfile | 1946
|Hydroelectric power project Cleuson-Dixence (VS, Switzerland): Grouting tests
British Library Conference Proceedings | 1993
|Hydroelectric power plant at Grande Dixence
Engineering Index Backfile | 1956
|SCC tunnel applications: Cleuson Dixence project and Loetschberg basis tunnel, Switzerland
British Library Conference Proceedings | 1999
|