Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Outline of proposed procedure; Northern and Southern Rhodesian Government should build dam, railway and power station; industry, mining coal and ore and constructing iron smelting and ferrochrome plants; at dam site, 300 ft dam will impound four times as much water as Boulder dam in United States and will enable 700,000 kw to be generated; deep inland waterway, 150 mi in length and nearly ten mi wide, will be created by dam.
Outline of proposed procedure; Northern and Southern Rhodesian Government should build dam, railway and power station; industry, mining coal and ore and constructing iron smelting and ferrochrome plants; at dam site, 300 ft dam will impound four times as much water as Boulder dam in United States and will enable 700,000 kw to be generated; deep inland waterway, 150 mi in length and nearly ten mi wide, will be created by dam.
Kariba Gorge scheme
S African Min Eng J
Burney, D. (Autor:in)
1948
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1958
|Engineering Index Backfile | 1960
Engineering Index Backfile | 1960
Engineering Index Backfile | 1961
|