Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Radiant-heated outside concrete ramp
Ramp, 85 ft long, built to facilitate movement of materials at factory in Amsterdam, NY, has been equipped with network of 8-in. wrought iron pipes through which hot water of 130 F is pumped, thus keeping pavement free of ice and snow.
Radiant-heated outside concrete ramp
Ramp, 85 ft long, built to facilitate movement of materials at factory in Amsterdam, NY, has been equipped with network of 8-in. wrought iron pipes through which hot water of 130 F is pumped, thus keeping pavement free of ice and snow.