Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Builders of Penn-Lincoln Parkway east solve complex design and construction problems
Papers presented at Structural Div, ASCE Pittsburgh meeting: Comprehensive Traffic Studies Determine Choice of Parkway Route, E. L. SCHMIDT; Downtown Interchange Will Carry Traffic Through Congested Pittsburgh Triangle, G. S. RICHARDSON; Twin Two-Lane Tubes Carry 4225-Ft Length of Parkway Under Squirrel Hill, O. SINGSTAD; Careful Scheduling of Operations Expedites Construction of Railroad Underpass, S. L. FULLER.
Builders of Penn-Lincoln Parkway east solve complex design and construction problems
Papers presented at Structural Div, ASCE Pittsburgh meeting: Comprehensive Traffic Studies Determine Choice of Parkway Route, E. L. SCHMIDT; Downtown Interchange Will Carry Traffic Through Congested Pittsburgh Triangle, G. S. RICHARDSON; Twin Two-Lane Tubes Carry 4225-Ft Length of Parkway Under Squirrel Hill, O. SINGSTAD; Careful Scheduling of Operations Expedites Construction of Railroad Underpass, S. L. FULLER.
Builders of Penn-Lincoln Parkway east solve complex design and construction problems
Civ Eng (NY)
1948
11 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Pittsburgh's Penn-Lincoln parkway
Engineering Index Backfile | 1944
Design is complicated on Penn-Lincoln Parkway
Engineering Index Backfile | 1954
Planning role in Pittsburgh's Penn-Lincoln Parkway
Engineering Index Backfile | 1957
|Many unusual structures feature Penn-Lincoln Parkway
Engineering Index Backfile | 1956
|New ventilating system designed for Penn-Lincoln parkway tunnel
Engineering Index Backfile | 1944
|