Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Terminal Island access road is completed as freeway at cost of $10,242,000
Plan of route from Seaside Blvd Terminal Island to Willow St, Long Beach, data on grade separation, connections, and design standards; submarine cables and power transmission lines had to be relocated; pipe sizes for storm drainage ranged from 18 in. to 48 in. in diam; pavement is of asphalt concrete using 85 to 100% penetration asphalt cement.
Terminal Island access road is completed as freeway at cost of $10,242,000
Plan of route from Seaside Blvd Terminal Island to Willow St, Long Beach, data on grade separation, connections, and design standards; submarine cables and power transmission lines had to be relocated; pipe sizes for storm drainage ranged from 18 in. to 48 in. in diam; pavement is of asphalt concrete using 85 to 100% penetration asphalt cement.
Terminal Island access road is completed as freeway at cost of $10,242,000
Calif Highways Pub Works
Langsner, G. (Autor:in)
1948
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Western Freeway upgrade completed
British Library Online Contents | 2008
Terminal Island freeway structures
Engineering Index Backfile | 1947
|Portion of Bayshore Freeway expected to be completed early next year
Engineering Index Backfile | 1947
|Portion of Bayshore Freeway expected to be completed early next year
Engineering Index Backfile | 1948
|Portion of Bayshore Freeway expected to be completed early next year
Engineering Index Backfile | 1947
|