Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction nears second-phase stage at $220,000,000 McNary Dam
McNary Dam across Columbia River at Umatilla, Ore, now under construction, consists of 7600 ft length of concrete and 700 ft of earthfill; two fish ladders are provided; potential power output amounts to some 1,380,000 kw; dam will also provide upstream pool of 60 mi of slackwater navigation for barge traffic through 9 ft channel to Pasco and into Snake River; notes on construction including change of 100 mi of track and 50 mi of road.
Construction nears second-phase stage at $220,000,000 McNary Dam
McNary Dam across Columbia River at Umatilla, Ore, now under construction, consists of 7600 ft length of concrete and 700 ft of earthfill; two fish ladders are provided; potential power output amounts to some 1,380,000 kw; dam will also provide upstream pool of 60 mi of slackwater navigation for barge traffic through 9 ft channel to Pasco and into Snake River; notes on construction including change of 100 mi of track and 50 mi of road.
Construction nears second-phase stage at $220,000,000 McNary Dam
Pac Bldr Engr
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Large scale construction at McNary
Engineering Index Backfile | 1949
Project construction at McNary Dam
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1953
|McNary Dam -- Coordination of project design and construction
Engineering Index Backfile | 1956
|Race against high water features cofferdam construction at McNary
Engineering Index Backfile | 1948
|