Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ontario hydro pushes work on power dam at Stewartville
Progress report on 206-ft high Stewartville dam of concrete gravity type; plan and typical cross sections; data on forms and placing of about 280,000 cu yd of concrete; concrete plant is designed for output of 120 cu yd per hr; steel plates are used as water-stops in vertical and horizontal construction joints; measures for concreting in winter.
Ontario hydro pushes work on power dam at Stewartville
Progress report on 206-ft high Stewartville dam of concrete gravity type; plan and typical cross sections; data on forms and placing of about 280,000 cu yd of concrete; concrete plant is designed for output of 120 cu yd per hr; steel plates are used as water-stops in vertical and horizontal construction joints; measures for concreting in winter.
Ontario hydro pushes work on power dam at Stewartville
Eng News-Rec
Engineering News-Record ; 141
1948
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bulletin - Hydro-Electric Power Commission of Ontario
TIBKAT | 1.1916 - 29.1942[?]
|Bulletin / Hydro-Electric Power Commission of Ontario
UB Braunschweig | 1.1916 - 29.1942[?]
|Research review / Ontario Hydro
TIBKAT | 1.1980 - 8.1993; damit Ersch. eingest.
|TIBKAT | 4.1952 - 14.1962
Ontario hydro research quarterly
TIBKAT | 15.1963 - 29.1977