Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Horizontal shear plane separates gravity and arch sections of dam
Arch section of Matilija Dam, Calif, rests on gravity section base and is separated from latter by shear plane thus permitting relative movement between both sections; copper water stop on upstream face prevents water from entering into slip joint; foundation conditions delayed work progress and increased total cost from original estimate of $800,000 to $2,200,000.
Horizontal shear plane separates gravity and arch sections of dam
Arch section of Matilija Dam, Calif, rests on gravity section base and is separated from latter by shear plane thus permitting relative movement between both sections; copper water stop on upstream face prevents water from entering into slip joint; foundation conditions delayed work progress and increased total cost from original estimate of $800,000 to $2,200,000.
Horizontal shear plane separates gravity and arch sections of dam
Eng News-Rec
Engineering News-Record ; 140
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Inclines of horizontal sections of Sayano-Shushenskaya arch-gravity dam
Online Contents | 2012
|Inclines of horizontal sections of Sayano-Shushenskaya arch-gravity dam
Online Contents | 2012
|Inclines of horizontal sections of Sayano-Shushenskaya arch-gravity dam
Springer Verlag | 2012
|Engineering Index Backfile | 1956
Engineering Index Backfile | 1937
|