Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Safety measures in pier erection
To provide maximum protection for workmen employed on construction of 12 90-ft concrete piers for new 1931-ft bridge across Monongahela River near Pittsburgh, Pa, complete scaffolding was built integrally with wooden forms used for pouring concrete; besides, workmen were provided with personal protective equipment, goggles, welding hoods, safety belts, Kapok filled life jackets and hard hats. (see also Roads and Streets v 91 n 9 Sept 1948 p 68-9; Construction Methods v 30 n 9 Sept 1948 p 75)
Safety measures in pier erection
To provide maximum protection for workmen employed on construction of 12 90-ft concrete piers for new 1931-ft bridge across Monongahela River near Pittsburgh, Pa, complete scaffolding was built integrally with wooden forms used for pouring concrete; besides, workmen were provided with personal protective equipment, goggles, welding hoods, safety belts, Kapok filled life jackets and hard hats. (see also Roads and Streets v 91 n 9 Sept 1948 p 68-9; Construction Methods v 30 n 9 Sept 1948 p 75)
Safety measures in pier erection
Concrete
Concrete ; 56
1948
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Safety measures in pier erection
Engineering Index Backfile | 1948
Safety measures in pier erection
Engineering Index Backfile | 1948
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
Safety Evaluation of Pier under Impact of Bridge Girder Erection Machine
British Library Conference Proceedings | 2012
|