Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Behind our atomic iron curtain big-scale construction goes on
Construction of Hanford plant at North Richland, Wash; electromagnetic plant and gaseous diffusion plant at Oak Ridge; new plant which is to manufacture plutonium will cost between $ 300 and $500 million; atomic power compared with that from coal and hydroelectric power; data on high temperature pile at Brookhaven Nat Laboratory on Long Island; metallic titanium considered material which can resist pile temperatures up to 2500 F.
Behind our atomic iron curtain big-scale construction goes on
Construction of Hanford plant at North Richland, Wash; electromagnetic plant and gaseous diffusion plant at Oak Ridge; new plant which is to manufacture plutonium will cost between $ 300 and $500 million; atomic power compared with that from coal and hydroelectric power; data on high temperature pile at Brookhaven Nat Laboratory on Long Island; metallic titanium considered material which can resist pile temperatures up to 2500 F.
Behind our atomic iron curtain big-scale construction goes on
Eng News-Rec
Colborn, R. (Autor:in)
Engineering News-Record ; 140
1948
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Innovation in construction - before the curtain goes up
Online Contents | 2013
|Innovation in construction – before the curtain goes up
Emerald Group Publishing | 2013
|Innovation in construction - before the curtain goes up
British Library Online Contents | 2013
|Behind the iron curtain : confession of a Soviet architect
TIBKAT | 2016
|Behind the Iron Curtain: Design and Design Research in Poland under Socialism
British Library Conference Proceedings | 1998
|