Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Effect of wave pressure; foundation and wall dimensions; wall was erected of 100-ton concrete blocks manufactured on site in steel forms; blocks were handled by traveling gantry crane, max wheel pressure of which is 45.5 tons; mole is 10 m wide, 5.25 m over normal water level, and has 2.6 by 2.6-m canal for cables and pipe lines.
Effect of wave pressure; foundation and wall dimensions; wall was erected of 100-ton concrete blocks manufactured on site in steel forms; blocks were handled by traveling gantry crane, max wheel pressure of which is 45.5 tons; mole is 10 m wide, 5.25 m over normal water level, and has 2.6 by 2.6-m canal for cables and pipe lines.
Construction of West and south mole on Island of Helgoland in north sea
Bau der West- und Suedmole in Helgoland
Frank, F. (Autor:in)
Bauingenieur ; 26
1951
8 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of North-East Seawall on Island of Helgoland
Engineering Index Backfile | 1930
|Coastal Protection at the North and Baltic Sea: Helgoland Island
HENRY – Bundesanstalt für Wasserbau (BAW) | 2008
|Construction of port of helgoland
Engineering Index Backfile | 1929
|