Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
City of Kitchener installs modern refuse incinerator
High temperature incinerator of Kitchener, Ont, consists of three Nichols Monohearth furnaces with 8 hr capacity of 72 tons; building constructed of concrete and brick, covers 3500 sq ft; 125 ft high stack is of concrete to roof level, and of radial brick for remainder of its height; 7 ft 9 in. inside diam at top; oil heating equipment, softeners, and water heaters.
City of Kitchener installs modern refuse incinerator
High temperature incinerator of Kitchener, Ont, consists of three Nichols Monohearth furnaces with 8 hr capacity of 72 tons; building constructed of concrete and brick, covers 3500 sq ft; 125 ft high stack is of concrete to roof level, and of radial brick for remainder of its height; 7 ft 9 in. inside diam at top; oil heating equipment, softeners, and water heaters.
City of Kitchener installs modern refuse incinerator
Mun Utilities
Hachborn, E.G. (Autor:in)
Municipal Utilities ; 90
1952
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern refuse incinerator -- Sanitary municipal utility
Engineering Index Backfile | 1936
|The trieste refuse incinerator
Engineering Index Backfile | 1913
Kitchener-Quarantaine garden, Lyons
Online Contents | 1995
|New refuse incinerator at Portland, Oregon
Engineering Index Backfile | 1933
|