Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Takoradi Harbour extensions
New works under construction include 1600 ft of deep water quay, providing three cargo berths, 3500 ft of quay wall, handling and storage facilities for logs and sawn timber, over 20 mi of sidings, 60,000 sq yd of roads and paved areas, road bridge, 42 electric cranes, and 70 acres of reclamation.
Takoradi Harbour extensions
New works under construction include 1600 ft of deep water quay, providing three cargo berths, 3500 ft of quay wall, handling and storage facilities for logs and sawn timber, over 20 mi of sidings, 60,000 sq yd of roads and paved areas, road bridge, 42 electric cranes, and 70 acres of reclamation.
Takoradi Harbour extensions
Engineer
Engineer ; 193
1952
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Extensions at Takoradi Harbour
Engineering Index Backfile | 1954
|Engineering Index Backfile | 1930
Engineering Index Backfile | 1952
Engineering Index Backfile | 1928
Politično-ekonomski temelji novega zahodnoafriškega naftnega mesta Sekondi-Takoradi
DOAJ | 2012
|