Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Harspranget hydro-electric scheme, Sweden
Development is one of largest in Europe, estimated annual power output being 1800 million kw-hr; there are three 96-mw turboalternators with provision for fourth set; scheme typical of modern Swedish developments consists of rock fill dam with intake works leading to underground power station below it, followed by unlined tailrace tunnel of large cross sectional area leading back to river; illustrations.
Harspranget hydro-electric scheme, Sweden
Development is one of largest in Europe, estimated annual power output being 1800 million kw-hr; there are three 96-mw turboalternators with provision for fourth set; scheme typical of modern Swedish developments consists of rock fill dam with intake works leading to underground power station below it, followed by unlined tailrace tunnel of large cross sectional area leading back to river; illustrations.
Harspranget hydro-electric scheme, Sweden
Engineer
Engineer ; 193
1952
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The trollhattan hydro-electric plant, Sweden
Engineering Index Backfile | 1909
|Development of Dalälven hydro power scheme in Sweden
British Library Online Contents | 2015
|Engineering Index Backfile | 1960
|Engineering Index Backfile | 1960
Engineering Index Backfile | 1949
|