Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Utilization of head of Peyrat-Le-Chateau, Haute Vienne, France
Plant of Faux-la-Montagne, head of 35.5 m; plant of Peyrat-Le-Chateau, annual production 110,000,000 kw-hr, head of 253 m; first has masonry dam 4 m high; second has concrete gravity dam 30 m high, forming basin of 107,000,000 cu m; underground power station 42 by 14 m contains three vertical Francis turbines coupled to 21,000-kva alternators.
Utilization of head of Peyrat-Le-Chateau, Haute Vienne, France
Plant of Faux-la-Montagne, head of 35.5 m; plant of Peyrat-Le-Chateau, annual production 110,000,000 kw-hr, head of 253 m; first has masonry dam 4 m high; second has concrete gravity dam 30 m high, forming basin of 107,000,000 cu m; underground power station 42 by 14 m contains three vertical Francis turbines coupled to 21,000-kva alternators.
Utilization of head of Peyrat-Le-Chateau, Haute Vienne, France
L'amenagement de la chute de Peyrat-Le-Chateau
Rodriguez, G. (Autor:in)
Genie Civil ; 128
1951
3 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
<>, Lanaud/Boisseuil, Haute-Vienne/Frankreich, 1994
British Library Online Contents | 1996
Les Gisements d'or de la région de Saint-Yrieix (Haute-Vienne, France)
UB Braunschweig | 1941
|A20 motorway General Earthworks in Haute-Vienne
Online Contents | 1994
|Saint-Junien bypass in Haute-Vienne region. Environment-compliant works
British Library Online Contents | 2000
|