Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Castle bridge, Shrewsbury, prestressed concrete footbridge
New bridge across River Severn is first cantilever bridge of prestressed concrete construction in United Kingdom; it comprises two sets of three balanced cantilevers, cast in situ and wires posttensioned; Freyssinet system of prestressing employed; length 247 ft; illustrations. (unsigned descriptions) (See also Roads and Road Construction v 30 n 349 Jan 1952 p 14-5; Concrete and Constr Eng v 47 n 4 Apr 1952 p 115-9)
Castle bridge, Shrewsbury, prestressed concrete footbridge
New bridge across River Severn is first cantilever bridge of prestressed concrete construction in United Kingdom; it comprises two sets of three balanced cantilevers, cast in situ and wires posttensioned; Freyssinet system of prestressing employed; length 247 ft; illustrations. (unsigned descriptions) (See also Roads and Road Construction v 30 n 349 Jan 1952 p 14-5; Concrete and Constr Eng v 47 n 4 Apr 1952 p 115-9)
Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering
Harris, D.P. (Autor:in)
Engineering ; 172
1951
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|Castle bridge, Shrewsbury, prestressed concrete footbridge
Engineering Index Backfile | 1952
|Prestressed concrete footbridge
Engineering Index Backfile | 1946
Plymouth's new prestressed concrete footbridge
Engineering Index Backfile | 1953
Prestressed concrete footbridge on South Bank
Engineering Index Backfile | 1952