Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
U N completes link
400-ft long, 5-story high Conference Building. located between Secretariat and General Assembly building on New York City's East River bank; illustrations.
U N completes link
400-ft long, 5-story high Conference Building. located between Secretariat and General Assembly building on New York City's East River bank; illustrations.
U N completes link
Arch Forum
Architectural Forum ; 96
1952
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Novel alliance completes Springfield's new rail link in Queensland, Australia
British Library Online Contents | 2014
|INGENIÉRIE-INSTALLATIONS COMPLÈTES
Online Contents | 1996
Oeuvres cinématographiques complètes
Online Contents | 2008
|New Tyne Crossing, Newcastle, joint venture of bored and immersed tunnel completes the link
British Library Conference Proceedings | 2003
|