Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New construction methods in subway work under Philadelphia City Hall
Subway built from roof downward by continuous underpinning; method determined by poor character of foundation of building.
New construction methods in subway work under Philadelphia City Hall
Subway built from roof downward by continuous underpinning; method determined by poor character of foundation of building.
New construction methods in subway work under Philadelphia City Hall
Eng. News-Rec
1919
10 pages
16 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Philadelphia City Hall subway station
Engineering Index Backfile | 1919
|Subway construction in Philadelphia
Engineering Index Backfile | 1926
|Subway construction in Philadelphia
Engineering Index Backfile | 1921
|Investigation of vibration of City Hall in Philadelphia and of subway structure beneath
Engineering Index Backfile | 1937
|