Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Maintaining traffic during erection of Louisville bridge
By bunching trains to pass over bridge at noon hour or about 4 p. m. and diverting some trains to other bridges at critical stages in work, operation was maintained throughout two years, during which time about one mile of steel superstructure was erected.
Maintaining traffic during erection of Louisville bridge
By bunching trains to pass over bridge at noon hour or about 4 p. m. and diverting some trains to other bridges at critical stages in work, operation was maintained throughout two years, during which time about one mile of steel superstructure was erected.
Maintaining traffic during erection of Louisville bridge
Eng. News-Rec
1919
4 pages
7 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1919
Eigenfrequency Monitoring during Bridge Erection
British Library Online Contents | 1996
|Engineering Index Backfile | 1898
|Eigenfrequency Monitoring during Bridge Erection
Online Contents | 1996
|Bridge span collapses during erection
Engineering Index Backfile | 1927