Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method of rebuilding the Genesee River bridge, Lehigh Valley R. R.
Bridge originally built for 126-ton heavy-grade engine was brought up to capacity of Cooper's E 60 loading, which is present standard used on Lehigh Valley R. R. main-line bridges.
Method of rebuilding the Genesee River bridge, Lehigh Valley R. R.
Bridge originally built for 126-ton heavy-grade engine was brought up to capacity of Cooper's E 60 loading, which is present standard used on Lehigh Valley R. R. main-line bridges.
Method of rebuilding the Genesee River bridge, Lehigh Valley R. R.
Eng. Contracting
1919
3 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New Lehigh valley bridge over the Susquehanna river, near Towanda, Pa.
Engineering Index Backfile | 1907
|The new Lehigh valley bridge over the Susquehanna river, near Towanda, Pa.
Engineering Index Backfile | 1907
Lehigh valley completes musconetcong tunnel
Engineering Index Backfile | 1929
Lehigh valley three-cylinder locomotive
Engineering Index Backfile | 1924