Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New Boston water tunnel
Construction work under way on shafts of 13-mi. tunnel to bring water from Ware River to Wachusett reservoir; tunnel will have area equivalent to that of circle of 12 ft. 9 in. diameter; method of handling work on shaft No. 5, is described.
New Boston water tunnel
Construction work under way on shafts of 13-mi. tunnel to bring water from Ware River to Wachusett reservoir; tunnel will have area equivalent to that of circle of 12 ft. 9 in. diameter; method of handling work on shaft No. 5, is described.
New Boston water tunnel
Pub. Works
Public Works ; 59
1928
2 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
British Library Conference Proceedings | 1993
|Chelsea Creek tunnel for Boston water main
Engineering Index Backfile | 1915
|British Library Conference Proceedings | 1993
|Engineering Index Backfile | 1900