Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Street maintenance and repair in South Bend, Ind
Population of 110,000; 200 mi. of paved streets about 70 per cent of which are asphalt; $50,000 per year sufficient for Street Department to carry on its work; repairing service cuts; cost of operation.
Street maintenance and repair in South Bend, Ind
Population of 110,000; 200 mi. of paved streets about 70 per cent of which are asphalt; $50,000 per year sufficient for Street Department to carry on its work; repairing service cuts; cost of operation.
Street maintenance and repair in South Bend, Ind
Am. City
Goss, I.M. (Autor:in)
American City ; 38
1928
1 Fig.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Jefferson street bridge, South Bend, Ind
Engineering Index Backfile | 1906
Engineering Index Backfile | 1906
|Scottsdale Mall, South Bend, Indiana
British Library Online Contents | 1995
Reinforced concrete sewer at South Bend
Engineering Index Backfile | 1906