Rapid repaving of a busy St. Louis thoroughfare
Wood block replaced with granite blocks; testing and removing old concrete by scarifiers; early-strength cement used in concrete base laid at night only; work was allowed to be started on one side of roadway only, and at no time were more than three city blocks, and on only one side of street, to be closed to traffic; describes restrictions placed on work and specifications for contractors and length of time streets were closed.
Rapid repaving of a busy St. Louis thoroughfare
Wood block replaced with granite blocks; testing and removing old concrete by scarifiers; early-strength cement used in concrete base laid at night only; work was allowed to be started on one side of roadway only, and at no time were more than three city blocks, and on only one side of street, to be closed to traffic; describes restrictions placed on work and specifications for contractors and length of time streets were closed.
Rapid repaving of a busy St. Louis thoroughfare
Eng. News-Rec
Shifrin, H. (Autor:in)
Engineering News Record ; 100
1928
3 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rapid work in repaving lindell boulevard in St. Louis
Engineering Index Backfile | 1926
|Granite block repaving in Worcester
Engineering Index Backfile | 1915
|Repaving for very severe conditions
Engineering Index Backfile | 1950
Repaving granite block streets in New York
Engineering Index Backfile | 1920
Repaving st. John and rothesay road
Engineering Index Backfile | 1931
|