Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Checking shore erosion near Toronto
Mississippi mats found effective in building up washedout ground at site of Scarboro township water-works pumphouse; details of manufacture and placing of mats; cost of work was in neighborhood of $3000.
Checking shore erosion near Toronto
Mississippi mats found effective in building up washedout ground at site of Scarboro township water-works pumphouse; details of manufacture and placing of mats; cost of work was in neighborhood of $3000.
Checking shore erosion near Toronto
Contract Rec
1928
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Breakwater construction, Toronto island shore
Engineering Index Backfile | 1923
|Shore Erosion in Russian Arctic
British Library Conference Proceedings | 2002
|Beach erosion and shore protection
Engineering Index Backfile | 1949
|Beach erosion and shore protection
Engineering Index Backfile | 1928
|