Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Use of Larssen rivetless sheet piling in construction of the Kuesten Canal between Hunte and Ems rivers
Employment of Larssen sheet piling in construction of lock structures, landings, moorings, etc., of canal for craft up to 800 tons displacement; application of Larssen piling in construction of power house, retaining wall etc. (See also - no. 32 July 27 and 1928, pp. 455-458)
Use of Larssen rivetless sheet piling in construction of the Kuesten Canal between Hunte and Ems rivers
Employment of Larssen sheet piling in construction of lock structures, landings, moorings, etc., of canal for craft up to 800 tons displacement; application of Larssen piling in construction of power house, retaining wall etc. (See also - no. 32 July 27 and 1928, pp. 455-458)
Use of Larssen rivetless sheet piling in construction of the Kuesten Canal between Hunte and Ems rivers
Verwendung von nietlosen Spundwaenden Bauart Larssen beim Ausbau des Hunte-Ems-Kanals (Kuestenkanal)
Popken, R. (Autor:in)
Bautechnik ; 6
1928
4 pages
19 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1910
|Life of larssen sheet piling seawall in tropical sea water
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1927
|UB Braunschweig | 1.1929 - 17.1936[?]