Concrete road construction in Quebec
Construction of 10.64 mi. of concrete road from St. John to Rouses Point; central mixing plant installed at St. Blaise; handling concrete on long hauls; tests show high quality concrete. Abstracted from Mun. Improvements. (see also Contract Rec., vol. 42, no. 8, Feb. 22, 1928, pp. 199-200, 8 figs)
Concrete road construction in Quebec
Construction of 10.64 mi. of concrete road from St. John to Rouses Point; central mixing plant installed at St. Blaise; handling concrete on long hauls; tests show high quality concrete. Abstracted from Mun. Improvements. (see also Contract Rec., vol. 42, no. 8, Feb. 22, 1928, pp. 199-200, 8 figs)
Concrete road construction in Quebec
Can. Engr
Canadian Engineer ; 55
1928
2 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete road construction in Quebec
Engineering Index Backfile | 1928
Progress of road construction in Quebec
Engineering Index Backfile | 1925
|Record year in road construction and maintenance in Quebec
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1951
|Engineering Index Backfile | 1924
|