Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building a highway across a North Dakota lake
Filling in old trestle involved unusual difficulties due to lateral flow of muck in lake bottom; construction difficulties; placing of earth fill on soft lake bottom and bringing fill up to existing swing bridge without displacing piling under bridge seats; contractor's procedure.
Building a highway across a North Dakota lake
Filling in old trestle involved unusual difficulties due to lateral flow of muck in lake bottom; construction difficulties; placing of earth fill on soft lake bottom and bringing fill up to existing swing bridge without displacing piling under bridge seats; contractor's procedure.
Building a highway across a North Dakota lake
Highway Mag
Pease, R.A. (Autor:in)
Highway Magazine ; 19
1928
3 pages
2 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Missouri river highway bridges in North Dakota
Engineering Index Backfile | 1927
|State highway problems and practices in North Dakota
Engineering Index Backfile | 1951
|A difficult highway embankment job in North Dakota
Engineering Index Backfile | 1930
Devils Lake Flood Risk Management - Geotechnical Aspects, Devils Lake, North Dakota
British Library Conference Proceedings | 2014
|