Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Costs and cost keeping on road work; contractors should have proper cost-accounting system; estimating production costs; allowance for depreciation; accurate costs of great importance; estimating production cost; contractor's overhead costs. Paper presented at Ontario Road Builders' Assn. (See also Can. Engr vol. 55, no. 1, July 3, 1928 pp. 104-106; Good Roads, vol. 71, no. 7, July 1928, pp. 402-405; Surveyor, vol. 73, no. 1894, May 11, 1928, pp. 511-512)
Costs and cost keeping on road work; contractors should have proper cost-accounting system; estimating production costs; allowance for depreciation; accurate costs of great importance; estimating production cost; contractor's overhead costs. Paper presented at Ontario Road Builders' Assn. (See also Can. Engr vol. 55, no. 1, July 3, 1928 pp. 104-106; Good Roads, vol. 71, no. 7, July 1928, pp. 402-405; Surveyor, vol. 73, no. 1894, May 11, 1928, pp. 511-512)
Highway construction cost keeping
Roads Streets
Brown, W.H. (Autor:in)
Roads and Streets ; 73
1928
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Highway construction cost keeping
Engineering Index Backfile | 1928
|Highway construction cost keeping
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1918
|Cost-keeping for highway contractors
Engineering Index Backfile | 1919
|"High Cost of Highway Construction"
Engineering Index Backfile | 1947