Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Analysis of articles by two Dutch engineers on progress of reclaiming part of the Zuyder Zee, which began in 1920 and will require 30 years to finish; gives details of dike built to cut off Yssel lake and locks at Weiringen.
Analysis of articles by two Dutch engineers on progress of reclaiming part of the Zuyder Zee, which began in 1920 and will require 30 years to finish; gives details of dike built to cut off Yssel lake and locks at Weiringen.
Actual state of reclamation of the Zuyder Zee
L'etat actuel des travaux d'asschement du Zuyderzee (Pays-Bas)
Bijls, A. (Autor:in)
Genie Civil ; 92
1928
4 pages
5 Figs.
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Inclosure and partial reclamation of Zuyder Zee
Engineering Index Backfile | 1931
|Zuyder Zee reclamation works; Medemblik pumping station
Engineering Index Backfile | 1930
|State Reclamation in Washington
ASCE | 2021
|Reclamation of sites contaminated with toxic-noxious wastes: strategies of action an actual case
British Library Conference Proceedings | 1997
|