Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Signal maintenance on the frisco
Interesting records of primary battery operation on 884 miles of road signaled with semaphores; average cost of maintenance and operation per signal, per month in 1927 was $8.95; details of construction; signal maintenance organization.
Signal maintenance on the frisco
Interesting records of primary battery operation on 884 miles of road signaled with semaphores; average cost of maintenance and operation per signal, per month in 1927 was $8.95; details of construction; signal maintenance organization.
Signal maintenance on the frisco
Ry. Signaling
Railway Signaling ; 21
1928
4 pages
8 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
D. C. Signal Construction on Frisco
Engineering Index Backfile | 1924
Elsevier | 1986
Online Contents | 1978
|Design - Zukunftsorientiert - Büromöbelsystem "Frisco" von Werndl
Online Contents | 1998
|Frisco opens route into Pensacola
Engineering Index Backfile | 1928