Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
L. and N. completes second track on Kentucky division
Article deals with general program for double tracking and grade revision on Kentucky division; detailed account of units of project which have been carried out during past four years; first work between Corbin and Sinks; difficult tunnel work at Boone Gap; care exercised to safeguard operated line; all tunnels have concrete floors; nine new tunnels aggregating 5360 ft. in length were constructed.
L. and N. completes second track on Kentucky division
Article deals with general program for double tracking and grade revision on Kentucky division; detailed account of units of project which have been carried out during past four years; first work between Corbin and Sinks; difficult tunnel work at Boone Gap; care exercised to safeguard operated line; all tunnels have concrete floors; nine new tunnels aggregating 5360 ft. in length were constructed.
L. and N. completes second track on Kentucky division
Ry. Age
Railway Age ; 84
1928
5 pages
11 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Alpha Natural Resources Completes Sale of Assets in Eastern Kentucky
Online Contents | 2017
Hyperloop One completes second test phase
British Library Online Contents | 2017
Double-span lift bridge completes unusual six-track river crossing
Engineering Index Backfile | 1938
Double-span lift bridge completes unusual six-track river crossing
Engineering Index Backfile | 1938
Concrete trestles on Tennessee division second track, Illinois Central R. R.
Engineering Index Backfile | 1915