Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Form details and methods used in casting penstock saddles for Vermont power development; method of handling completed saddles; labor cost of forming and casting was approximately $8.00 per saddle.
Form details and methods used in casting penstock saddles for Vermont power development; method of handling completed saddles; labor cost of forming and casting was approximately $8.00 per saddle.
Precast penstock saddles
Concrete
Mayers, C.W. (Autor:in)
Concrete ; 33
1928
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Madison Penstock Rehabilitation
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1941
|Cleuson Dixence Penstock Tunnel
British Library Conference Proceedings | 2000
|Engineering Index Backfile | 1944
|Steel Penstock Rehabilitation Strategies
British Library Conference Proceedings | 1995
|