Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Field tests permit early opening of pavements
How Connecticut State Highway Department secures high early-strength concrete which permits use of shorter curing period; investigation regarding early-strength concrete.
Field tests permit early opening of pavements
How Connecticut State Highway Department secures high early-strength concrete which permits use of shorter curing period; investigation regarding early-strength concrete.
Field tests permit early opening of pavements
Concrete
Flood, F.G. (Autor:in)
Concrete ; 32
1928
4 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Effects of Permit and Illegal Overloads on Pavements
NTIS | 1987
|Early Opening of PCC Pavements to Traffic
British Library Conference Proceedings | 1993
|Optimizing opening of PCC pavements using integrated seismic lab and field tests
Tema Archiv | 2003
|Process to Estimate Permit Costs for Movement of Heavy Trucks on Flexible Pavements
British Library Online Contents | 2010
|