Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Heating a modern office building
Building contains 20 stories and basement; steam is supplied through 4-in. connection at pressure of approximately 100 lb. per sq. in. from mains of New York Steam Corporation; how condensation is handled; exhaust ventilation for toilet rooms.
Heating a modern office building
Building contains 20 stories and basement; steam is supplied through 4-in. connection at pressure of approximately 100 lb. per sq. in. from mains of New York Steam Corporation; how condensation is handled; exhaust ventilation for toilet rooms.
Heating a modern office building
Heating Vent. Mag.
1928
3 pages
4 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Heating and ventilating a modern office building
Engineering Index Backfile | 1924
Radiant panel heating in modern office building
Engineering Index Backfile | 1952
|Heating and cooling for a modern bank and office building
Engineering Index Backfile | 1931
|Ventilating modern office building
Engineering Index Backfile | 1932
Engineering Index Backfile | 1896
|