Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The head-water canal of a hydroelectric plant under construction in Upper Bavaria is being conducted through four tunnels which are being built with the aid of a new and what is claimed to be remarkable type of tunnel scaffolding designed by Alfred Kunz, Munich, Germany. Comparison with other types.
The head-water canal of a hydroelectric plant under construction in Upper Bavaria is being conducted through four tunnels which are being built with the aid of a new and what is claimed to be remarkable type of tunnel scaffolding designed by Alfred Kunz, Munich, Germany. Comparison with other types.
A new type of tunnel scaffolding
Tunnelrustung Bauart Alfred Kunz in Mu nchen
Pressel, Konrad (Autor:in)
1921
5 pages
8 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.