Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Difficult swamp road construction
Wide sand embankment sunk to hard bottom 35 ft. deep. Fresh fill settled 8 ft. overnight. Original surface upheaved 8 ft. Hard bottom brought to top alongside embankment.
Difficult swamp road construction
Wide sand embankment sunk to hard bottom 35 ft. deep. Fresh fill settled 8 ft. overnight. Original surface upheaved 8 ft. Hard bottom brought to top alongside embankment.
Difficult swamp road construction
Public Works
Public Works ; 50
1921
2 pages
3 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1928
|Four-mile causeway carries state road over swamp
Engineering Index Backfile | 1924
|Piles through old swamp roadbed carry concrete road
Engineering Index Backfile | 1924
|Swamp road building among the Indiana sand dunes
Engineering Index Backfile | 1924
|