Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Destruction of jetty and basin quay wall in front of new Baltic Sea Locks of the Kaiser-Wilhelm Canal
Describes work of destroying 185 meters of jetty wall, including 20, 000 cu.m. of masonry, 3000 of which were above water; and 300 m. of quay wall in port basin, including 6500 cu.m. sand concrete, mostly under water and 1600 cu.m. brick masonry, mostly above water.
Destruction of jetty and basin quay wall in front of new Baltic Sea Locks of the Kaiser-Wilhelm Canal
Describes work of destroying 185 meters of jetty wall, including 20, 000 cu.m. of masonry, 3000 of which were above water; and 300 m. of quay wall in port basin, including 6500 cu.m. sand concrete, mostly under water and 1600 cu.m. brick masonry, mostly above water.
Destruction of jetty and basin quay wall in front of new Baltic Sea Locks of the Kaiser-Wilhelm Canal
Beseitigung der Kreuzermole und der Binnenhafenkaimauer vor den neuen Ostseeschleusen der Kaiser-Wilhelm-Kanals
Lohmeyer, H. (Autor:in)
1921
13 pages
12 Figs.
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
The new Baltic sea locks of the Kaiser-Wilhelm canal
Engineering Index Backfile | 1923
|Engineering Index Backfile | 1895
Engineering Index Backfile | 1907
Engineering Index Backfile | 1878
Engineering Index Backfile | 1958
|