Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of substructure for platte river bridge
Concrete piles jetted in sand for new bridge of C. B. and Q. R. R. Sand ejector clears concrete caissons. Steam box for rapid curing of piles.
Construction of substructure for platte river bridge
Concrete piles jetted in sand for new bridge of C. B. and Q. R. R. Sand ejector clears concrete caissons. Steam box for rapid curing of piles.
Construction of substructure for platte river bridge
Eng. News-Rec.
Merriam, J.H. (Autor:in)
1921
4 pages
5 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Bridge Over Platte River on BNSF
British Library Conference Proceedings | 1998
|Platte river bridge reconstruction, rock island lines
Engineering Index Backfile | 1920
Substructure of Marsh river bridge
Engineering Index Backfile | 1904
|Speer Boulevard Bridge Replacement South Platte River
British Library Conference Proceedings | 2000
|Discussion: Substructure of Marsh River Bridge
ASCE | 2021
|