Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Chicago tunnel development -- Unusual district heating plan
Design of proposed central heating plant for Chicago tunnel system to have generating capacity of approximately 250,000 lb to 300,000 lb per hr for each boiler unit.
Chicago tunnel development -- Unusual district heating plan
Design of proposed central heating plant for Chicago tunnel system to have generating capacity of approximately 250,000 lb to 300,000 lb per hr for each boiler unit.
Chicago tunnel development -- Unusual district heating plan
Heating Vent
De Wolf, R.D. (Autor:in)
1934
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 1993
|TIBKAT | 1993
|Engineering Index Backfile | 1912
|