Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Heavy-duty concrete road to Norris dam
Construction of concrete highway, 4.8 mi long, for heavy hauling between railroad and dam site; road is contracted to be finished in 69 working days.
Heavy-duty concrete road to Norris dam
Construction of concrete highway, 4.8 mi long, for heavy hauling between railroad and dam site; road is contracted to be finished in 69 working days.
Heavy-duty concrete road to Norris dam
Eng News-Rec
Engineering News-Record ; 112
1934
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1934
Heavy-duty concrete pavement for Messent road, Bombay
Engineering Index Backfile | 1948
|Engineering Index Backfile | 1963
|Demountable cableways place concrete at Norris dam
Engineering Index Backfile | 1934