Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of high-type bituminous pavements
Bureau of Public Roads study of construction methods and costs on 23 bituminous concrete highway projects, in 7 States, with aggregate length of 150 mi; typical procedure; plant modifications; time distribution and delay; efficiency of management; rates of production; loss of time due to weather; characteristics of typical dryers; pug mill operation; finishing operations; rolling requirements. (See also Contractors and Engrs Monthly v 29 n 4 and 5 Oct 1934 p 38-40 and Nov p 30-2)
Construction of high-type bituminous pavements
Bureau of Public Roads study of construction methods and costs on 23 bituminous concrete highway projects, in 7 States, with aggregate length of 150 mi; typical procedure; plant modifications; time distribution and delay; efficiency of management; rates of production; loss of time due to weather; characteristics of typical dryers; pug mill operation; finishing operations; rolling requirements. (See also Contractors and Engrs Monthly v 29 n 4 and 5 Oct 1934 p 38-40 and Nov p 30-2)
Construction of high-type bituminous pavements
Pub Roads
Rogers, C.F. (Autor:in)
Public Roads ; 15
1934
25 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of high-type bituminous pavements
Engineering Index Backfile | 1934
|Engineering Index Backfile | 1936
|Engineering Index Backfile | 1916
|Factors in construction of bituminous pavements
Engineering Index Backfile | 1916
|Construction and destruction of bituminous pavements
Engineering Index Backfile | 1948
|