Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Equipment and methods of raising and moving 12 miter-gate leaves at Miraflores; largest are 82 ft high and have estimated gross weight of 790 tons; comparisons between experimental equipment and methods used at Pedro Miguel, in 1929, and present system; improvements in technique. (See also - n 5 May discussion p 768-9)
Equipment and methods of raising and moving 12 miter-gate leaves at Miraflores; largest are 82 ft high and have estimated gross weight of 790 tons; comparisons between experimental equipment and methods used at Pedro Miguel, in 1929, and present system; improvements in technique. (See also - n 5 May discussion p 768-9)
Renewal of miter-gate bearings, Panama canal
Am Soc Civ Engrs -- Proc
Morse, C. (Autor:in)
1934
25 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Renewal of Miter-Gate Bearings, Panama Canal
ASCE | 2021
|Discussion of “Morse on Renewal of Miter-Gate Bearings”
ASCE | 2021
|Closure to “Randolph on Renewal of Miter-Gate Bearings”
ASCE | 2021
|