Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Radial gates, gate hoists, high pressure gates, and outlet pipes for spillway and outlet works at Hyrum dam, Hyrum project, Utah
Schedule, specifications and drawings for three 16-ft by 12-ft radial gates; three motor-driven, double-drum, radial gate hoists; four 2-ft 9-in. by 2-ft 9-in. high pressure gates together with hydraulic hoists, gate hangers, automatic air valves, and conduit linings; and two plate steel outlet pipes for installation in spillway and outlet works.
Radial gates, gate hoists, high pressure gates, and outlet pipes for spillway and outlet works at Hyrum dam, Hyrum project, Utah
Schedule, specifications and drawings for three 16-ft by 12-ft radial gates; three motor-driven, double-drum, radial gate hoists; four 2-ft 9-in. by 2-ft 9-in. high pressure gates together with hydraulic hoists, gate hangers, automatic air valves, and conduit linings; and two plate steel outlet pipes for installation in spillway and outlet works.
Radial gates, gate hoists, high pressure gates, and outlet pipes for spillway and outlet works at Hyrum dam, Hyrum project, Utah
U S Bur Reclamation -- Specifications
1934
23 pages
26 Supp sheet
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Portage mountain project spillway and low level outlet works
Engineering Index Backfile | 1967
|Completion of Embankment, Spillway and Outlet Works
NTIS | 1990
|Lake Blalock Spillway and Outlet Works Improvements
British Library Conference Proceedings | 1999
|Ensuring the Safety of Spillway Radial Gates
Online Contents | 1997
|