Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Umbau und Erweiterung des Maschinen-Laboratoriums der E.T.H.
Symposium by ROHN, O. R. SALVISBERG, M. MEIER and P. E. SOUTTER, on reconstruction and re-equipment of mechanical laboratory of Zurich Institute of Technology, including reinforced concrete chimney of original design, having total height of 63.15 m; total cost was in excess of 10,000,000 Swiss francs. (See also - n 1 July 7 1934 p 1-9)
Umbau und Erweiterung des Maschinen-Laboratoriums der E.T.H.
Symposium by ROHN, O. R. SALVISBERG, M. MEIER and P. E. SOUTTER, on reconstruction and re-equipment of mechanical laboratory of Zurich Institute of Technology, including reinforced concrete chimney of original design, having total height of 63.15 m; total cost was in excess of 10,000,000 Swiss francs. (See also - n 1 July 7 1934 p 1-9)
Umbau und Erweiterung des Maschinen-Laboratoriums der E.T.H.
Umbau und Erweiterung des Maschinen-Laboratoriums der E.T.H.
1934
5 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Erweiterung des Europäischen Laboratoriums für Teilchenphysik (CERN) in Genf
Online Contents | 2000
Erdbaukurs der ^E.T.H. (Eidgenössischen Technischen Hochschule)
TIBKAT | 1938
|Autohaus Bauplanung : Neubau, Umbau, Erweiterung
UB Braunschweig | 1994
|